久久久社区-非洲一级片-国产www免费观看-97天天操-日欧一片内射va在线影院-久久尤物免费一区二区三区-无码任你躁久久久久久老妇蜜桃-精品人人人人-性视频黄色-国产片在线播放-在线国产日韩-久碰人妻人妻人妻人妻人掠-夜夜夜撸-高清不卡av-娇小6一8小毛片-九九午夜-亚洲一区二区三区尿失禁-俄罗斯大荫蒂女人毛茸茸-大肉大捧一进一出视频-天堂中文在线观看视频

上海金泰工程機(jī)械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

No.07 SD20 Rotary Drill construct in XiLong Jobsite

2009-07-07

Recently, in XiLong hydro junction jobsite, Hubei province, one unit SD20 which had worked for 6000 hours has set the new record in foundation piles.

 

XiLong hydro junction started in Feb, 2009 is the major national project, which is located in HuBei province. One of important projects is to establish a bridge on old riverbed. It is difficult with high pile requirements. The pile should be 1.5m Dia and 55m Dep. The situation of the old riverbed is complicated, and alternative allocated with clay, fine sand, and locked clay from 0-30m, below 30m, there is big and hard cobble layer.


When SD20 applied to the project, it finish a 55m depth and 1.5 dia pile with 8 hours, high efficiency and precision is praised by the projects owner. This SD20 had worked more than 6000 hours since may, 2006. The excellent performance has greatly proved the quality of our machines.

Now, this project is under way, SD20 and SG40A, SG40E worked there day and night to contribute to the national infrastructure projects.